Skip to content

The platform

See inside North Lorenz.

The same view a customer sees the first time they open the platform. Six screens: the operating dashboard, regulatory intelligence, AI document generation, the five signal domains, the procedure register, and the sealed audit trail. The tour auto-advances; click any number, or hover to pause.

Sample tenant
Magnolia Petrochemical
4 sites · 38 regulations
illustrative data only
northlorenz.com/platform
STOP WORK
Z
zach@northlorenz.com
HOME · DASHBOARD

Good morning, Zach. Magnolia is holding.

live · 14:22 CST
4 SITES · 9 ACTIVE PERMITS · 2 ALERTS
Doctrine alignment
94%
↑ 3 pts · last 30 days
Open permits
9
3 closing this shift
Procedures · drift
7
2 since regulation revision
Days · TRIR safe
412
since 2024.04.06
Operating brief — last 24h 14 events · auto-curated
14:18Drift detected — SOP-1204 Hot Work Permit has not been refreshed against API 2201 (2024 rev).SITE 7 · KEMP
13:52Permit HW-0418 closed clean — 4/4 signatures held.SITE 4 · RIVERS
13:14SPCC plan revision v.7 submitted to compliance review.SITE 2 · OLEUM
11:36JHA missing for tank-bottom sampling on the 13:00–21:00 shift.SITE 7 · KEMP
10:08Training certified — 12 contractors on confined-space entry.SITE 4 · RIVERS
08:44Federal Register update parsed — 29 CFR 1910.119 revision pending.REG · FED
Sites 4 of 4 · ground truth
Site 2 · Oleum
LA · S2 · 78 staff
96
Site 4 · Rivers
LA · S4 · 142 staff
94
Site 7 · Kemp
LA · S7 · 96 staff
71
Site 9 · Coker
LA · S9 · 64 staff
92
Build something AI · doctrine-aligned
New SPCC Plan
40 CFR 112 · suggested
NEW
JHA · Tank Sampling
site 7 · gap detected
GAP
HOME · REGULATORY

29 CFR 1910.119 — revision posted to the Federal Register

tracking 38 regulations
FED · OSHA · API · ISO · STATE
Federal Register · 90 FR 18204 · pending compliance date

Process Safety Management — refinery process hazard analysis requirements updated.

Published 2026.05.14 · effective 2026.08.12 · 90-day comment window closes 2026.06.13
82d
until enforcement
Affected procedure Site Clause Last verified Score
PSM Compliance AuditSOP-1119 SITE 7 1910.119(e) 2024.08.11 63
Process Hazard Analysis · RevalidationSOP-1124 SITE 7 1910.119(e)(6) 2025.02.18 71
Mechanical Integrity · InspectionSOP-1132 SITE 2 1910.119(j) 2026.04.02 88
Management of ChangeSOP-1141 SITE 4 1910.119(l) 2026.03.21 91
Pre-Startup Safety ReviewSOP-1148 SITE 9 1910.119(i) 2026.02.09 86
Emergency Planning & ResponseSOP-1155 SITE 7 1910.119(n) 2026.01.15 74
Clause diff — 1910.119(e)(6) redline · auto
(6) The employer shall update and revalidate the process hazard analysis at least every five (5) years to assure + hazard analysis at least every three (3) years to assure that it is consistent with the current process. The process hazard analysis shall be performed by a team + with expertise in engineering, process operations, + and the affected unit’s mechanical integrity history.
HOME · PROGRAM ENG. · GENERATE

Drafting · SPCC Plan — Magnolia Petrochemical, Site 2 (Oleum)

MODEL · NL-DOCTRINE-v4 · CITATION-GROUNDED
streaming · 1,408 / ~3,800 tokens
SPCC Plan · Site 2, Oleum Storage Yard
40 CFR 112 · 3,800 words est. · 22 citations
generating

§ 1 · Facility description

Magnolia Petrochemical’s Oleum Storage Yard operates twelve aboveground bulk storage containers with an aggregate capacity of 1.42 MMbbl, exceeding the threshold for an SPCC plan 40 CFR 112.1(d). The facility is upstream of navigable waters of the United States 40 CFR 112.1(b), requiring full plan certification by a licensed Professional Engineer 40 CFR 112.3(d).

§ 2 · Plan management & review

This plan shall be reviewed and amended whenever there is a material change in design, construction, operation, maintenance, or other circumstances 40 CFR 112.5(a). At minimum, the owner shall complete a review and evaluation of the plan at least once every five years 40 CFR 112.5(b).

§ 3 · Containment & diversionary structures

Each bulk storage container is provided with secondary containment sized to hold the capacity of the largest single container plus sufficient freeboard for precipitation 40 CFR 112.7(c). Containment for the Oleum yard is constructed of reinforced concrete with a sealed coating system meeting 40 CFR 112.7(c)(1)

Doctrine alignment 11 DNA pillars · live
01Regulatory citation100
02Site-specific data96
03Recordkeeping triggers94
04Responsible person named100
05Frequency / cadence92
06Containment quantification78
07Inspection / monitoring88
08Reporting threshold95
09Training requirement
10Cross-references resolved
11PE certification block
Rolling score
93 / 100 · 8 of 11 pillars resolved
HOME · INTELLIGENCE · SASI · SIGNAL DOMAINS

The five signals that move the needle. Operational pressure is the differentiator.

computed 14:22 CST · rolling 28d
MAGNOLIA · ROLLED UP · 4 SITES
Signal radar 0–100 · higher = healthier
Operational pressure 86 Procedural drift 62 Personnel watch 74 Permit velocity 81 Incident cadence 55
Domains, ranked vs. 90-day baseline
Permit velocity81 →
Median time from permit request to safe close.
Personnel watch74 ↓
Watch-keeper coverage of confined-space and hot-work permits.
Procedural drift62 ↓
Procedures lagging current regulation revision — primarily Site 7.
Incident cadence55 →
Near-miss reporting volume normalized to hours-worked.
HOME · PROGRAM ENG. · DOCUMENTS

Every procedure, scored against the regulation it was written for.

2,408 PROCEDURES · 38 REGULATIONS
last cross-walk · 14:18 CST
showing 8 of 218 with drift > 5pts
site · all sort · alignment ↓
ID Procedure Regulation Site Status Score
SOP-1204 Hot Work Permit · Issuance & Closeout API 2201 SITE 7 DRIFT 71
SOP-1119 PSM Compliance Audit Schedule 29 CFR 1910.119 SITE 7 REVISE 63
SOP-0418 Confined Space Entry Procedure 29 CFR 1910.146 SITE 4 ALIGNED 96
SOP-2207 Lockout / Tagout · Energy Isolation 29 CFR 1910.147 ALL ALIGNED 92
PLN-0902 SPCC Plan · Oleum Storage Yard 40 CFR 112 SITE 2 CURRENT 98
JHA-1881 Tank-Bottom Sampling · Manual 29 CFR 1910.120(q) SITE 7 MISSING
SOP-1141 Management of Change · Process 29 CFR 1910.119(l) SITE 4 ALIGNED 91
SOP-1132 Mechanical Integrity · Inspection Cycle 29 CFR 1910.119(j) SITE 2 ALIGNED 88
HOME · INTELLIGENCE · AUDIT TRAIL

Every signature, every revision — cryptographically sealed since day one.

14,228 sealed events · last 90d
MAGNOLIA · 4/4 SITES · CHAIN OK
Permits seal-verified
100%
1,408 of 1,408 · ytd
Closeout time · median
−64%
vs. 6-mo baseline
Avg. alignment
94
+3 over rolling 30d
Signatures held
4 of 4
supervisor · safety · gas · final
Chain integrity · OK
SEAL · NL-2026.05.22 · 7a9b·44c1·82e3·3c4f
VERIFIED
Recent events 14,228 sealed · last 90d
14:22:18 Permit HW-0418 closed clean · 4/4 signatures. m.haines a91f·82c3
14:18:02 Drift detected · SOP-1204 vs. API 2201 (2024 rev). north.lorenz 71e0·44ab
13:52:44 SPCC v.7 submitted for compliance review. k.ortega 3c4f·82e3
13:14:20 AI draft · MOC procedure regenerated · 11/11 pillars resolved. north.lorenz e012·a8b7
10:08:36 12 contractors certified · confined-space entry (29 CFR 1910.146). l.dupree b4d2·6611
08:44:09 Federal Register parsed · 29 CFR 1910.119 revision flagged for review. north.lorenz 7a9b·44c1
07:31:51 Permit CS-0921 opened · Site 4 · contractor watch assigned. m.haines 2241·09cf

01 · DASHBOARDThe operating brief — every shift opens here.

Live tour · northlorenz.com/platform
Magnolia Petrochemical · illustrative tenant

This is sample data. In a pilot, the dashboard reads your operation.

North Lorenz runs at app.northlorenz.com: the same screens you just saw, your data inside. Your facilities, your procedures, the regulations you operate under. Pilot engagements are open for Q2 2026.

Request pilot →